Inspection & Test Plans (ITP) Management Training Course

Shows how to develop, review, implement and control ITPs that set inspection activities, acceptance criteria, responsibilities and verification points.

QC · Quality Control & Quality AssuranceAll Levels#2852ClassroomEnglish , Arabic
Duration
5 Days
Download BrochureView Upcoming Dates

Free substitution at any time · 30+ days' notice: full refund minus 10%. Cancellation policy

Course Overview

Inspection and Test Plans (ITPs) are essential quality assurance documents used to define inspection activities, testing requirements, acceptance criteria, responsibilities, and verification points throughout project execution. Effective ITP management helps organizations verify that materials, workmanship, equipment, and completed activities comply with contractual requirements, approved specifications, engineering standards, and applicable regulations. This course provides practical guidance on developing, reviewing, implementing, and controlling ITPs across engineering, construction, manufacturing, maintenance, and industrial projects. Participants examine inspection stages, hold points, witness points, review points, inspection methods, testing procedures, acceptance criteria, and documentation requirements. The course also addresses coordination between contractors, subcontractors, quality teams, clients, and third-party inspection agencies to ensure that inspections are properly planned, executed, witnessed, and documented. Through practical exercises and project-based scenarios, participants develop the skills to prepare risk-informed inspection plans, verify compliance requirements, manage inspection records, control nonconformities, and coordinate inspection activities with project schedules. The emphasis is on preventing defects, improving traceability, reducing rework, and ensuring that inspection and testing activities provide reliable evidence of conformity throughout the project lifecycle.

Learning Objectives

  • Explain the purpose, structure, and contractual significance of Inspection and Test Plans.
  • Develop ITPs aligned with project specifications, engineering standards, and quality requirements.
  • Identify inspection stages, verification activities, and required documentation.
  • Define hold points, witness points, review points, and surveillance activities.
  • Establish measurable acceptance criteria and appropriate inspection methods.
  • Assign responsibilities to contractors, clients, quality teams, and third-party inspectors.
  • Coordinate inspection and testing activities with project schedules and work procedures.
  • Manage inspection records, test reports, and traceability documentation.
  • Identify, document, and resolve nonconformities arising from inspection and testing.
  • Monitor ITP implementation and improve inspection effectiveness throughout project execution.

Who Should Attend

Quality assurance and quality control engineers. Inspection and testing engineers and inspectors. Construction and project quality managers. Mechanical, civil, electrical, and instrumentation engineers. Welding, piping, structural, and equipment inspection personnel. Project engineers and construction supervisors. Contractor and subcontractor quality representatives. Document controllers and quality documentation specialists. Third-party inspection coordinators and technical assurance professionals. Professionals working in oil and gas, petrochemicals, power generation, manufacturing, infrastructure, and industrial maintenance.

Learning Outcomes

  • Interpret ITP requirements and their relationship with project specifications and quality plans.
  • Prepare structured ITPs for different project activities and technical disciplines.
  • Identify applicable codes, standards, procedures, and acceptance requirements.
  • Define inspection and testing stages, responsibilities, and notification requirements.
  • Distinguish between hold, witness, review, and surveillance points.
  • Establish clear acceptance criteria and inspection frequencies.
  • Coordinate inspection activities with work packages, method statements, and project milestones.
  • Maintain traceable inspection records and supporting quality documentation.
  • Manage inspection failures, nonconformity reports, and corrective actions.
  • Evaluate ITP effectiveness and identify opportunities to strengthen project quality control.

Course Outline

Day 1

Fundamentals of Inspection and Test Plan Management

  • Purpose and role of ITPs within quality assurance and quality control systems.
  • Relationship between ITPs, project quality plans, inspection procedures, method statements, and technical specifications.
  • Understanding contractual requirements, applicable codes, engineering standards, and regulatory obligations.
  • ITP structure, terminology, document formats, and approval workflows.
  • Identifying project activities, inspection stages, and verification requirements.
  • Defining responsibilities for contractors, subcontractors, clients, consultants, and third-party inspectors.
  • Understanding quality documentation, inspection records, and traceability requirements.
  • Reviewing common ITP deficiencies and their impact on project execution.
  • Practical Exercise: Review a sample ITP and identify missing inspection activities, unclear responsibilities, and gaps in quality requirements.
Day 2

Developing ITPs, Inspection Points, and Acceptance Criteria

  • Collecting inspection requirements from drawings, specifications, contracts, and approved procedures.
  • Breaking down work packages into measurable inspection and testing activities.
  • Defining inspection methods, sampling requirements, test frequencies, and acceptance criteria.
  • Establishing hold points, witness points, review points, and surveillance activities.
  • Understanding notification periods, inspection release requirements, and authorization to proceed.
  • Linking inspection activities to approved method statements and work procedures.
  • Applying risk-based thinking when determining inspection coverage and verification priorities.
  • Reviewing ITPs for completeness, technical consistency, and contractual compliance.
  • Practical Exercise: Develop an ITP for a selected activity, defining inspection stages, responsible parties, verification methods, and acceptance criteria.
Day 3

Implementing ITPs and Coordinating Inspection Activities

  • Implementing approved ITPs during construction, installation, manufacturing, and maintenance activities.
  • Coordinating inspections between project teams, contractors, clients, and independent inspection bodies.
  • Managing inspection requests and inspection notification procedures.
  • Verifying material certificates, equipment identification, calibration status, and inspection readiness.
  • Coordinating dimensional checks, visual inspections, functional tests, and required non-destructive testing.
  • Monitoring hold and witness points before authorizing subsequent work activities.
  • Integrating inspection activities with construction schedules, work permits, and project milestones.
  • Managing inspection delays, incomplete work, and readiness failures.
  • Practical Exercise: Prepare an inspection coordination plan for a project activity, including notification requirements, inspection sequence, responsibilities, and release conditions.
Day 4

Inspection Documentation, Nonconformities, and Quality Records

  • Preparing inspection reports, test records, checklists, and supporting documentation.
  • Managing material test certificates, calibration records, and test equipment documentation.
  • Establishing traceability between inspection results, materials, equipment, and completed work.
  • Reviewing test results against approved acceptance criteria.
  • Identifying and documenting nonconformities, deviations, and failed inspections.
  • Applying nonconformity reporting and corrective action procedures.
  • Managing reinspection, retesting, repair verification, and inspection closeout.
  • Maintaining document control, revision history, approval status, and record completeness.
  • Practical Exercise: Review an inspection dossier, identify documentation and compliance gaps, and prepare a nonconformity report with appropriate corrective actions.
Day 5

ITP Monitoring, Auditing, and Continuous Improvement

  • Monitoring ITP implementation and verifying completion of required inspection stages.
  • Conducting ITP compliance reviews and quality audits.
  • Measuring inspection effectiveness using indicators such as first-pass acceptance, defect rates, rework, and inspection turnaround time.
  • Identifying recurring inspection failures and opportunities for preventive action.
  • Reviewing ITP changes resulting from design revisions, approved deviations, and site conditions.
  • Coordinating final inspections, outstanding punch-list items, and quality dossier completion.
  • Evaluating contractor and supplier inspection performance.
  • Applying lessons learned to improve future ITP development and implementation.
  • Practical Exercise: Evaluate the effectiveness of an implemented ITP using sample project records and develop an improvement plan covering compliance, documentation, inspection performance, and closeout requirements.

Upcoming Dates

Selected date

Salalah · 18 – 22 Oct 2027 · Classroom

Need more details?Chat with us on WhatsApp

CityDatesPrice per ParticipantEarly Bird
RiyadhScheduled
2 – 6 Nov 2026€4,200—
SalalahScheduled
9 – 13 Nov 2026€5,300—
AbujaScheduled
16 – 20 Nov 2026€5,100—
AccraScheduled
23 – 27 Nov 2026€5,100€4,590until 2 Nov
AmmanScheduled
29 Nov – 3 Dec 2026€3,100€2,790until 9 Nov
AmsterdamScheduled
7 – 11 Dec 2026€5,400€4,860until 16 Nov
BangkokScheduled
7 – 11 Dec 2026€6,100€5,490until 16 Nov
BarcelonaConfirmed
14 – 18 Dec 2026€5,400€4,860until 23 Nov
BeirutScheduled
20 – 24 Dec 2026€4,000€3,600until 30 Nov
BerlinScheduled
28 Dec 2026 – 1 Jan 2027€5,800€5,220until 7 Dec
CairoScheduled
3 – 7 Jan 2027€3,300€2,970until 14 Dec
Cape TownScheduled
11 – 15 Jan 2027€5,100€4,590until 21 Dec
DammamScheduled
18 – 22 Jan 2027€4,200€3,780until 28 Dec
DohaScheduled
18 – 22 Jan 2027€4,400€3,960until 28 Dec
DubaiScheduled
24 – 28 Jan 2027€4,400€3,960until 4 Jan
IstanbulScheduled
1 – 5 Feb 2027€4,700€4,230until 11 Jan
JeddahScheduled
7 – 11 Feb 2027€4,200€3,780until 18 Jan
KigaliScheduled
15 – 19 Feb 2027€5,100€4,590until 25 Jan
Kuala LumpurScheduled
22 – 26 Feb 2027€4,400€3,960until 1 Feb
LisbonScheduled
1 – 5 Mar 2027€5,400€4,860until 8 Feb
LondonScheduled
8 – 12 Mar 2027€5,600€5,040until 15 Feb
MadinahScheduled
8 – 12 Mar 2027€4,200€3,780until 15 Feb
MadridScheduled
15 – 19 Mar 2027€5,400€4,860until 22 Feb
MakkahScheduled
22 – 26 Mar 2027€4,200€3,780until 1 Mar
ManamaScheduled
29 Mar – 2 Apr 2027€4,700€4,230until 8 Mar
MuscatScheduled
5 – 9 Apr 2027€5,300€4,770until 15 Mar
OnlineScheduled
11 – 15 Apr 2027€1,700€1,530until 22 Mar
ParisScheduled
19 – 23 Apr 2027€5,700€5,130until 29 Mar
RiyadhScheduled
26 – 30 Apr 2027€4,200€3,780until 5 Apr
SalalahScheduled
26 – 30 Apr 2027€5,300€4,770until 5 Apr
SalalahScheduled
18 – 22 Oct 2027€5,300€4,770until 27 Sept

Available in: Istanbul · Dubai · London · Riyadh · Doha · Amsterdam

Related Courses

Ready to Elevate Your Team's Capabilities?

Speak with our advisors about upcoming programmes or a bespoke corporate training plan.